Testimonials
oct 2019 | Project at Manufacturing Facility for a Major International Tire Manufacturer
“Within a 150 yard pour using EdenCrete at 2 gal/yd.3, we had a small section of approximately 2’ x 15’ damaged due to the formwork. The finish for this specific location was not acceptable for the engineer where the new concrete met the existing and he required it to be removed and replaced. We started tearing it out on Thursday at noon when the concrete was ~18 days old. The engineer called me at 5pm and said they were still not finished with the concrete demolition. He asked me to come out on site to monitor the situation. Upon arrival, I took control of the jackhammer to demonstrate how it should be done. Much to my surprise, the jackhammer was bouncing off of the concrete surface unlike anything I have ever witnessed before. It was the hardest concrete any of us have ever attempted to demolish. We had planned on breaking it out in a couple of hours and had a yard of EdenCrete Concrete on will call for 3:30pm the same afternoon. We did not finish the demolition until 730pm and poured concrete at 11:30am the next day.”
Jan. 2019 | I-16 10.81 Miles of PCCP (Twiggs)
Dec. 2018 | Recent Ready-Mix Company Owner and Professional Concrete Consultant
Dec. 2018 | Edencrete solves troublesome wall cracking
EdenCrete was a great help on this project and I look forward to working with it in the future.”